What Drawings Are Needed for a Building Permit?
Most Ontario building permit applications need drawings that clearly show the existing conditions, the proposed work and how the project is intended to comply with applicable requirements. The exact drawing set varies by project, but it often includes floor plans, elevations, sections, construction details and a site plan.
Floor plans
Show the existing and proposed layout, room uses, dimensions, openings and work being changed.
Elevations and sections
Show exterior changes, heights, assemblies and vertical relationships where required.
Site plan
Shows property/site information, building location, setbacks and other site data where the project requires it.
Technical coordination
Structural, HVAC, plumbing and other information is added or coordinated when the permit scope requires it.
Property and municipality still matter
This answer is a practical starting point, not a permit decision for every property. Zoning, existing conditions, applicable law, project size and the municipality’s current application guide can change what is required.
Related 828 Design service
Building Permit Drawings & Application Support →
Reviewed against current municipal permit guidance: August 2026. Requirements are confirmed for the actual property and project before design/submission.
Need drawings for this project?
Send the property address, what you want to build and any survey, existing drawings, photos or municipal comments you already have.