Do I Need a Basement Permit?
A basement project may need a building permit when it creates or alters living space, adds a second unit, changes stairs or exits, creates a walkout, moves plumbing or HVAC, or affects structure. A simple cosmetic refresh is different from work that changes Building Code-regulated elements.
Basement apartment / second unit
Creating or legalizing an additional dwelling unit typically involves permit and zoning review.
Basement walkout or new entrance
Excavation, openings, stairs, drainage and structure can trigger a permit.
Structural changes
Beams, posts, wall removal or foundation work can require structural information.
Cosmetic-only work
Painting and finishes alone are different from work that changes regulated building systems.
Property and municipality still matter
This answer is a practical starting point, not a permit decision for every property. Zoning, existing conditions, applicable law, project size and the municipality’s current application guide can change what is required.
Related 828 Design service
Basement Permit Drawings & Secondary Suite Design →
Reviewed against current municipal permit guidance: August 2026. Requirements are confirmed for the actual property and project before design/submission.
Need drawings for this project?
Send the property address, what you want to build and any survey, existing drawings, photos or municipal comments you already have.